"C","野花社区. Morning Report" "C","Filename: morning_report_20251102_20251102115018000.csv" "C","Report for 11/02/2025" "C","Report generated 11/03/2025 09:50:01 EST" "H","Report Type","Status" "D","Morning Report","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","11/02/2025","00:00:00" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","11/01/2025","19","13331" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26450 "D","B. Capacity Additions EcoMax Bid > CSO",1395 "D","C. Generation Outages and Reductions",7269 "D","D. Uncommitted Available Generation (Non-fast start)",3526 "D","E. DRR Capacity",169 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",398 "D","NECEC",0 "D","NY野花社区AC",-506 "D","NY野花社区CSC",330 "D","NY野花社区NNC",0 "D","Phase 2",543 "D","Net Deliveries",765 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",16442 "D","I. Peak Load Forecast For Hour Ending18",13860 "D","J. Total Operating Reserve Requirement",2118 "D","K. Capacity Required = I + J",15978 "D","L. Surplus = (+) Deficiency = (-) (H - K)",464 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",284 "D","Section 4. Largest First Contingency MW",1248 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",17256 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1498 "D","Ten Minute Reserve Estimate:",1498 "D","Thirty Minute Reserve Requirement:",620 "D","Thirty Minute Reserve Estimate:",1084 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,100,0 "D","NB",-650,400,398 "D","NECEC",0,0,0 "D","NY野花社区AC",-1000,500,-506 "D","NY野花社区CSC",-346,330,330 "D","NY野花社区NNC",-60,60,0 "D","Phase 2",-1400,1200,543 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Clear","W 8",48 "D","Hartford","Partly cloudy","S 4",47 "H","Section 9. SAR Available","Value" "D","NYISO","" "H","Section 10. Capacity of Non-Commercial Units" "D","Total Available", "H","Section 11. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 12. Geomagnetic Disturbance Activity" "H","Description","Value" "D","Forecast:","" "D","Alert:","" "D","Intensity:","" "D","Observed Activity:","" "D","Actions Taken or Planned by ISO-NE:","" "D","Actions Taken or Planned by Other Control Areas:","" "T","46 lines"